UPS, Battery & Facility Infrastructure Decommissioning

The IT load is only part of a decommissioning. UPS systems, battery strings, PDUs, cooling units and containment carry real safety and environmental obligations. USACA Group removes facility infrastructure with trained crews and compliant downstream handling, documented to the same standard as the IT estate.

Who this service is for

Facilities and critical-environment teams, landlords restoring building condition, programs closing or repurposing rooms, and operators replacing end-of-life power and cooling plant.

Safe, compliant removal of UPS systems, batteries, PDUs, cooling and containment with full environmental documentation.

  • UPS decommissioning
  • battery removal data center
  • PDU removal
  • CRAC unit removal
  • data center infrastructure removal

What you receive

  • UPS and battery removal

    UPS modules and battery strings isolated, de-installed and removed by trained crews under documented safety procedure.

  • Compliant battery handling

    Lead-acid and lithium batteries routed to permitted downstream processors with transfer documentation retained.

  • Power and cooling plant

    PDUs, switchgear tie-ins, CRAC and CRAH units and pipework disconnected and removed with trade support.

  • Containment and cabling

    Racks, containment, ladder rack, trays and structured cabling stripped to the agreed building condition.

  • Environmental record

    Weights, streams and downstream processors documented so the environmental position is auditable.

How it works

A documented process, start to certificate.

  1. Step 01

    Survey & risk assess

    Plant surveyed, isolation points confirmed and method statements and risk assessments issued.

  2. Step 02

    Isolate

    Electrical and mechanical isolation performed with licensed trades and permits in place.

  3. Step 03

    De-install

    UPS, batteries, PDUs and cooling plant broken down and packaged for safe handling.

  4. Step 04

    Remove

    Material rigged out with floor protection and route planning to avoid building damage.

  5. Step 05

    Process downstream

    Batteries and regulated material sent to permitted processors; metals and plastics recovered.

  6. Step 06

    Document

    Weights, streams, transfer notes and the environmental record delivered as one package.

FAQ

Common questions

Still unsure? Send the details through an inquiry and a specialist will answer directly — usually within one business day.

Let's solve what's next

Stay connected.

Tell us what you need and we will connect you with the right USACA Group team — recovery, semiconductor, hardware or global supply chain.